Change order of artboard in layer panel on duplicate
When option dragging an existing artboard, the new artboard is placed above the existing one in the artboards panel. I think this is not logical. It should be places under the existing artboard. In most cases, duplicating an artboard is done to continue in the flow of thought, which should be left to right or top to bottom.
3
votes
